Skip to main content
E4 | Lexington Modern | Engineered for Accessibility

Up Next

Back to Show
This Old House

E4 | Lexington Modern | Engineered for Accessibility

Season 45 Episode 4

Great progress is being made on the project house. The primary addition is being framed and the rooms are starting to take shape. A sound deadening wall is built. A lally column is removed and a larger ridge beam is installed to create an open kitchen and dining area. The homeowners choose hardscape finishes based on 3D renderings. An accessible designed bathroom is toured.

Only Available with Passport Starting
7/19/2024