Skip to main content
E4 | Lexington Modern | Engineered for Accessibility

Up Next

E13 | Suburban Victorian | Pouring It On

E13 | Suburban Victorian | Pouring It On

Season 47 Episode 13
23:42
Episode 5: The Calling

The Calling

Season 4 Episode 5
53:05
When Whales Could Walk

When Whales Could Walk

Season 51 Episode 1
53:31
Back to Show
This Old House

E4 | Lexington Modern | Engineered for Accessibility

Season 45 Episode 4

Great progress is being made on the project house. The primary addition is being framed and the rooms are starting to take shape. A sound deadening wall is built. A lally column is removed and a larger ridge beam is installed to create an open kitchen and dining area. The homeowners choose hardscape finishes based on 3D renderings. An accessible designed bathroom is toured.

Support Provided By
E15 | Suburban Victorian | Getting Our Ducts in a Row
23:42
HVAC subs are here to re-duct the house and make the system more efficient.
E14 | Suburban Victorian | Reduce, Reside, Recycle
23:42
Aluminum siding removal; Visit to a recycling center; Installing a steel beam.
E13 | Suburban Victorian | Pouring It On
Unlock with PBS Passport
23:42
Kevin and Tom carefully remove kitchen cabinets for use in a new pantry.
Active loading indicator