Compressed Air in the Tunnels

Work never stopped on the Pennsylvania Railroad’s tunneling projects; there were three 8-hour shifts a day, 7 days a week. As the workers dug under the river bed, compressed air was pumped in to keep the water out of the tunnels. To bore under the river, the engineers used a Greathead shield, a steel cylinder with a diameter of 23 feet that weighed nearly 200 tons.

Support Provided By
Season
The Presidents: FDR (Part 2)
Unlock with PBS Passport
2:16:40
Part of the award-winning The Presidents collection.
The Presidents: FDR (Part 1)
Unlock with PBS Passport
1:44:52
Part of the award-winning The Presidents collection.
The Presidents: LBJ (Part 2)
Unlock with PBS Passport
1:50:24
Follow LBJ from rural Texas to his ascendancy to the presidency after the assassination of JFK.
The Presidents: LBJ (Part 1)
Unlock with PBS Passport
1:50:37
Part of the award-winning The Presidents collection.
The Presidents: Nixon
2:47:05
Part of the award-winning The Presidents collection.
Active loading indicator