Back to Show
This Old House
E20 | Glen Ridge Generational | QR Construction
Season 45
Episode 20
The new two-story addition is framed, and the front porch is being rebuilt. Painting starts on the new wood windows. An interior wall is framed to straighten out a sag in the upper floor. Exterior colors are chosen, plumbing pipes are isolated from cold weather, and header-less window opening is framed. A foolproof method of laying out plumbing and electrical fixtures is shared.
Support Provided By
23:42
HVAC subs are here to re-duct the house and make the system more efficient.
23:42
Aluminum siding removal; Visit to a recycling center; Installing a steel beam.
Unlock with PBS Passport
23:42
Kevin and Tom carefully remove kitchen cabinets for use in a new pantry.