
Back to Show
This Old House
E20 | Glen Ridge Generational | QR Construction
Season 45
Episode 20
The new two-story addition is framed, and the front porch is being rebuilt. Painting starts on the new wood windows. An interior wall is framed to straighten out a sag in the upper floor. Exterior colors are chosen, plumbing pipes are isolated from cold weather, and header-less window opening is framed. A foolproof method of laying out plumbing and electrical fixtures is shared.
Sign up now for inspiring and thought-provoking media delivered straight to your inbox.
Support Provided By

23:42
With the build coming to an end, Kevin checks in with the team to see what's left.

23:42
Kevin heads to Williamson College of the Trades to hear how some graduates are doing.

Unlock with PBS Passport
23:42
Heath visits Keith Cambell to check in on the rewiring of an antique chandelier.