Back to Show
American Experience
Alaska Pipeline: Atigun Pass
In the winter of 1976, Alaska Pipeline construction workers faced the daunting task of laying pipe at Atigun Pass, the highest point on the line rising at 4,800 feet above sea level. Additionally, the arctic weather made for extremely difficult working conditions. Due to the threat of avalanches at Atigun Pass, the pipe had to be buried beneath the permafrost soil.
Support Provided By
52:54
The untold story of the people who fought tirelessly to save women from cervical cancer.
52:51
The story of the German American Bund, a pro-Nazi group active across the US in the 1930s.
1:47:20
The story of a Mississippi town’s effort to integrate its public schools in 1970.
1:52:38
Revisit 1970s Boston, when court-mandated school integration unleashed racial unrest.
1:36:51
Casa Susanna was a refuge for transgender women and cross-dressing men in the 1950s-60s.
Unlock with PBS Passport
1:22:39
Discover the story of the 1969 showdown between President Nixon and the antiwar movement.
1:52:23
How a horrific incident of racial violence became catalyst for the civil rights movement.
1:52:47
Part Two examines the mounting dispute over strategies and reveals the pervasive racism.
1:52:42
The fiery campaign that led to passage of the 19th Amendment, granting women the vote.