Back to Show
American Experience
Building a Supply Road for the Pipeline
On April 29, 1974, construction began on a haul road that would link the Yukon River to Prudhoe Bay. Truckers would use the road throughout the construction of the pipeline to transport goods to the North Slope as well as to camps along the way. By fall, the 360-mile long road was ready and would be used to haul three million tons of pipe, machinery, spare parts, fuel and food for 2 1/2 years.
Support Provided By
52:54
The untold story of the people who fought tirelessly to save women from cervical cancer.
52:51
The story of the German American Bund, a pro-Nazi group active across the US in the 1930s.
1:47:20
The story of a Mississippi town’s effort to integrate its public schools in 1970.
1:52:38
Revisit 1970s Boston, when court-mandated school integration unleashed racial unrest.
1:36:51
Casa Susanna was a refuge for transgender women and cross-dressing men in the 1950s-60s.
Unlock with PBS Passport
1:22:39
Discover the story of the 1969 showdown between President Nixon and the antiwar movement.
1:52:23
How a horrific incident of racial violence became catalyst for the civil rights movement.
1:52:47
Part Two examines the mounting dispute over strategies and reveals the pervasive racism.
1:52:42
The fiery campaign that led to passage of the 19th Amendment, granting women the vote.